Whitlock Park Pathway Project

Tue September 24, 2019

The pathway paving project at Whitlock Park begins Tuesday, Sept. 24. Anticipated completion is late October.

The existing perimeter pathways at Whitlock Park are limestone screenings (gravel) surface, which requires frequent repairs after heavy rains, and can be unpassable at times when wet. In addition, the gravel surface is not considered a wheelchair-accessible surface. Paving the existing trails with asphalt will reduce day-to-day maintenance and create a fully-accessible surface.